MichaelBone / city_of_mitcham_sa_development_applications

City of Mitcham (South Australia) Development Applications

Scrapes eproperty.mitchamcouncil.sa.gov.au


Contributors MichaelBone

Last run completed successfully .

Console output of last run

Injecting configuration and compiling... [1G [1G-----> Node.js app detected [1G [1G-----> Creating runtime environment [1G [1G NPM_CONFIG_LOGLEVEL=error [1G NPM_CONFIG_PRODUCTION=true [1G NPM_CONFIG_CAFILE=/etc/ssl/certs/ca-certificates.crt [1G NODE_VERBOSE=false [1G NODE_ENV=production [1G NODE_TLS_REJECT_UNAUTHORIZED=0 [1G NODE_MODULES_CACHE=true [1G [1G-----> Installing binaries [1G engines.node (package.json): 10.6.0 [1G engines.npm (package.json): unspecified (use default) [1G [1G Resolving node version 10.6.0... [1G Downloading and installing node 10.6.0... [1G Using default npm version: 6.1.0 [1G [1G-----> Restoring cache [1G Skipping cache restore (not-found) [1G [1G-----> Building dependencies [1G Installing node modules (package.json) [1G [1G > sqlite3@4.0.4 install /tmp/build/node_modules/sqlite3 [1G > node-pre-gyp install --fallback-to-build [1G [1G [sqlite3] Success: "/tmp/build/node_modules/sqlite3/lib/binding/node-v64-linux-x64/node_sqlite3.node" is installed via remote [1G added 144 packages from 115 contributors and audited 274 packages in 13.469s [1G found 0 vulnerabilities [1G [1G [1G-----> Caching build [1G Clearing previous node cache [1G Saving 2 cacheDirectories (default): [1G - node_modules [1G - bower_components (nothing to cache) [1G [1G-----> Build succeeded! [1G [1G-----> Discovering process types [1G Procfile declares types -> scraper Injecting scraper and running... There are 9 pages to parse. Parsing page 1 of 9. There are 9 pages to parse. Parsing page 1 of 9. Parsing page 2 of 9. There are 9 pages to parse. Parsing page 1 of 9. Parsing page 2 of 9. Parsing page 3 of 9. There are 9 pages to parse. Parsing page 1 of 9. Parsing page 2 of 9. Parsing page 3 of 9. Parsing page 4 of 9. Parsing page 5 of 9. Parsing page 6 of 9. Parsing page 5 of 9. Parsing page 6 of 9. Parsing page 7 of 9. Parsing page 5 of 9. Parsing page 6 of 9. Parsing page 7 of 9. Parsing page 8 of 9. Parsing page 5 of 9. Parsing page 6 of 9. Parsing page 7 of 9. Parsing page 8 of 9. Parsing page 9 of 9. Complete.

Data

Downloaded 1 time by MichaelBone

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (264 KB) Use the API

rows 10 / 645

council_reference address description info_url comment_url date_scraped date_received on_notice_from on_notice_to
080/0855/18
1 Harcourt Avenue BELAIR SA 5052
Attached Verandah
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-28
080/0807/18
17 Eynesbury Avenue KINGSWOOD SA 5062
Demolish Existing Structures
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-27
080/0793/18
13 Bonview Avenue PANORAMA SA 5041
VerandahCONSTRUCT A DOMESTIC OUTBUILDING (SHED)CONSTRUCT A DETACHED STUDIO
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-18
080/0802/18
77 Kingston Avenue DAW PARK SA 5041
Dwelling Addition & VerandahCONSTRUCT A SINGLE STOREY DWELLING, GARAGE, PORTICO & VERANDAHDEMOLISH EXISTING DWELLING & OUTBUILDING
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-18
080/0813/18
15 Verco Avenue LOWER MITCHAM SA 5062
Swimming Pool & Safety Fence
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-25
080/0706/18
140 Crozier Avenue MELROSE PARK SA 5039
Single Storey Detached Dwelling and Shed
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-07-03
080/0817/18
65 Price Street MELROSE PARK SA 5039
Demolish Existing Dwelling, Pergola & Front Fence
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-07-02
080/0786/18
117 Cross Road HAWTHORN SA 5062
Free-Standing Carport
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-20
080/0826/18
90 Avenue Road CLARENCE GARDENS SA 5039
Single Storey Dwelling, Garage, Verandah & Portico
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-27
080/0846/18
24 Meadow Avenue HAWTHORNDENE SA 5051
Free-standing Carport
mailto:mitcham@mitchamcouncil.sa.gov.au
2018-07-15
2018-06-27

Statistics

Average successful run time: 12 minutes

Total run time: 1 day

Total cpu time used: 28 minutes

Total disk space used: 356 KB

History

  • Manually ran revision 58203725 and completed successfully .
    nothing changed in the database
    137 pages scraped
  • Auto ran revision 58203725 and failed .
    nothing changed in the database
  • Auto ran revision 58203725 and completed successfully .
    12 records added in the database
    137 pages scraped
  • Auto ran revision 58203725 and completed successfully .
    7 records added in the database
    131 pages scraped
  • Auto ran revision 58203725 and completed successfully .
    1 record added in the database
    129 pages scraped
  • ...
  • Created on morph.io

Show complete history