nvm if you need to be able to switch between versions.
./devcontainer directory contains config for running a Node 16 Dev Container. See https://code.visualstudio.com/docs/devcontainers/containerssqlite3 is pinned to ^5.1.6 in package.json - sqlite3 6.x does NOT run on Heroku-18 (which is what morph.io uses), so don't accept a Dependabot bump past the 5.x line without testing it on morph.io first. package.json (JSON) can't hold a comment next to the pin the way a Gemfile can, hence this note.In a terminal, run the following commands:
npm install
npm run dev
This will run the scraper whenever you save a change to a file.
Edit the .ts files in the src directory to make changes. These are TypeScript files that are "compiled" to JavaScript files in the build directory.
Ensure you have run npm run dev or npm run tsc before commiting and include the contents of ./build.
morph.io runs the built javascript, not typescript files.
To download data sign in with GitHub
rows 10 / 10
| council_reference | address | description | info_url | comment_url | date_scraped | on_notice_from | on_notice_to | documents |
|---|---|---|---|---|---|---|---|---|
|
DA-2026-200
|
89 Wingara Road, Howden, Tasmania
|
Outbuilding (shed)
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-12
|
2026-08-25
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-200-89-Wingara-Road-Howden.pdf"]
|
|
|
DA-2026-287
|
202 Channel Highway, Kingston, Tasmania
|
Change of use from General Retail and Hire to Hotel Industry (Bottle Shop)
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-12
|
2026-08-25
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-287-202-Channel-Highway-Kingston.pdf"]
|
|
|
DA-2026-157
|
59 Suncoast Drive, Blackmans Bay, Tasmania
|
Alteration to dwelling and fence
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-12
|
2026-08-25
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-157-00-59-Suncoast-Drive-Blackmans-Bay.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-157-01-Bushfire-hazard-report.pdf"]
|
|
|
DA-2026-217
|
279 Allens Rivulet Road, Allens Rivulet, Tasmania
|
Partial change of use to wine tasting and sales area
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-12
|
2026-08-25
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-217-279-Allens-Rivulet-Road-Allens-Rivulet.pdf"]
|
|
|
DA-2025-288
|
40 Wolfes Road, Neika and 1122 Huon Road, Neika, Tasmania
|
Extension to dwelling and associated works
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-12
|
2026-08-25
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-288-00-40-Wolfes-Road-Neika-and-1122-Huon-Road-Neika.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-288-01-Bushfire-hazard-report.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-288-02-Environmental-management-plan.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-288-03-Geotechnical-site-investigation-and-associated-engineering-advice.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-288-04-Natural-values-assessment.pdf"]
|
|
|
DA-2026-84
|
47 Summerleas Road and Whitewater Creek Reserve, Tasmania
|
26 multiple dwellings including stormwater and pedestrian connection works in Whitewater Creek Reserve (re-advertised)
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-08
|
2026-08-21
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-84-Advertised-plans.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-84-Bushfire-Hazard-Report.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-84-Natural-values-assessment-.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-84-Arboricultural-Report.pdf"]
|
|
|
DA-2026-206
|
4552 Bruny Island Main Road, Lunawanna, Tasmania
|
Dwelling and Ancillary Dwelling
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-08
|
2026-08-21
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-206-Advertised-plans.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-206-Foundation-and-Windloading-Assessment.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-206-Bushfire-Hazard-Report.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-206-Onsite-Wastewater-Assessment.pdf"]
|
|
|
DA-2026-265
|
181 Matthew Flinders Drive, Alonnah, Tasmania
|
Extension to dwelling
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-08
|
2026-08-21
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-265-181-MatthewFlinders-Drive-Alonnah.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-265-Architect-Statement.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-265-Bushfire-Hazard-Report.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-265-Environmental-Management-Plan.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-265-Onsite-Wastewater-Assessment.pdf"]
|
|
|
DA-2026-195
|
37 Pothana Road, Electrona, Tasmania
|
Workshop (concrete precast) and associated works
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-05
|
2026-08-18
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-195-00-37-Pothana-Road-Electrona.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-195-02-Coastal-erosion-hazard-risk-assessment.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2026-195-01-Pinnacle-Planning-Letter.pdf"]
|
|
|
DA-2025-360
|
92 Groningen Road, Kingston, Tasmania
|
Ancillary dwelling, alterations to dwelling and outbuildings
|
mailto:kc@kingborough.tas.gov.au
|
2026-08-13
|
2026-08-05
|
2026-08-18
|
["https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-360-00-92-Groningen-Road-Kingston.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-360-01-Bushfire-hazard-report.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-360-02-Onsite-wastwater-assessment.pdf","https://assets.kingborough.tas.gov.au/uploads/2026/08/DA-2025-360-03-Philip-Jackson-arvorist-assessment.pdf"]
|
Average successful run time: less than 5 seconds
Total run time: less than a minute
Total cpu time used: less than 10 seconds
Total disk space used: 611 KB