yourneighbourhood / MoretonBayDA

Moreton Bay Regional Council


Contributors yourneighbourhood

Last run failed with status code 999.

Console output of last run

Please install the Morph Github App on yourneighbourhood so that Morph can access this repository on GitHub. Please go to https://github.com/apps/morph-io/installations/new/permissions?repository_ids%5B%5D=285829518&repository_ids%5B%5D=63162019&repository_ids%5B%5D=255594086&repository_ids%5B%5D=257896404&repository_ids%5B%5D=241813144&repository_ids%5B%5D=191529652&repository_ids%5B%5D=191529569&repository_ids%5B%5D=257888973&repository_ids%5B%5D=139802182&repository_ids%5B%5D=257888382&repository_ids%5B%5D=191529721&repository_ids%5B%5D=257896850&repository_ids%5B%5D=255592709&repository_ids%5B%5D=257879057&suggested_target_id=15703123 Why? See https://morph.io/documentation/github_app

Data

Downloaded 13 times by yourneighbourhood srsmonty

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (8.4 MB) Use the API

rows 10 / 25104

info_url council_reference date_received description address date_scraped comment_url
2018/36397/V2W
2018-07-02
Material Change of Use - Development Permit for Dwelling House (Siting, Dux Creek Preliminary Approval)
10 Aquila Circuit, BANKSIA BEACH QLD 4507
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36393/V3RM
2018-07-02
Reconfiguring a Lot - Development Permit for Subdivision (1 into 16 Lots)
49-51 Bunya Crossing Road, EATONS HILL QLD 4037
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36394/V6
2018-07-02
Building Works - Development Permit for Dwelling House Extension and Carport (Siting & Scenic Amenity Overlay)
Unit 3 1814 Mt Glorious Road, MOUNT GLORIOUS QLD 4520
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36407/V6
2018-07-04
Building Works - Development Permit for Domestic Outbuilding (Height & Flood Hazard Overlay)
78 Springfield Drive, BURPENGARY QLD 4505
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2016/33286/V4D/17
2018-07-03
Operational Works - Development Permit for Roadworks, Stormwater and Earthworks (Newport, Stage A27)
Lot 888 Lakeview Promenade NEWPORT QLD 4020
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36400/V2W
2018-07-02
Material Change of Use - Development Permit for Dwelling House (Cut & Fill and Landslide)
107-113 Ira Buckby Road West, CASHMERE QLD 4500
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36398/V4E
2018-07-02
Operational Works - Development Permit for Earthworks
1 Phoenix Court, EATONS HILL QLD 4037
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2018/36402/V6
2018-07-03
Building Works - Development Permit for Domestic Outbuilding (Height, Siting & Bushfire) - assessed against the Planning Scheme
24 Bushcherry Court, BURPENGARY EAST QLD 4505
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2017/35379/V4D/1
2018-07-03
Operational Works - Development Permit for Drainage Work, Landscaping, Stormwater, On-site Carparking and Industrial Driveway Access Crossover
106 Flinders Parade, NORTH LAKES QLD 4509
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au
2017/35286/V4LE
2018-07-02
Operational Works - Development Permit for Landscaping (External)
Bribie Island RSL 93-105 Toorbul Street, BONGAREE QLD 4507
2018-07-05
mailto:mbrc@moretonbay.qld.gov.au

Statistics

Average successful run time: about 16 hours

Total run time: over 1 year

Total cpu time used: 9 days

Total disk space used: 8.45 MB

History

  • Auto ran and failed .
  • Auto ran and failed .
  • Auto ran and failed .
  • Auto ran and failed .
  • Auto ran and failed .
  • ...
  • Created on morph.io

Show complete history

Scraper code

Ruby

MoretonBayDA / scraper.rb